Jump to content

Recommended Posts

Posted

The nuts and bolts are going out Monday to be zinc plated, CHP vin officer will replace the old vin tag on the 26th,.and few item are left to be powdered on the 27th. In between all the waiting I'm gonna polish what I can to be ready to build 4th of July weekend.

I'm still missing nerfs, and shocks

Sent from my SM-G900V using Tapatalk

Posted

I'm in Bakersfield, I bought the tank because it was cheaper then finding blue fullbores and I found it on Amazon for 61.04, I thought it was a mistake. If I change I'm only out 61.04. I won't lie fitment it's the best I have seen

Sent from my SM-G900V using Tapatalk

Posted

I got a few more parts prep for the 4th of July build. The a-arms & swingarm with go off for powder the 27th. It's going slow but it will be worth it. C&R plating is doing the zinc plating on bolts. Next is fitting the pingel for the ims tank. Been hot in Bakersfield 107 to 114 all week.8bbb41d30ad067fe7a2268167ed587f0.jpgbadbe602f758548a6d350b980446e09f.jpg604d1d1fb580aa3d1364d04cab3ef404.jpg7b943eff930eb7fd5d3f26bb650d017b.jpg3c2980d9bb1c1cfb238599b78e47b24b.jpg

Sent from my SM-G900V using Tapatalk

  • 2 weeks later...
Posted
I got a few more parts prep for the 4th of July build. The a-arms & swingarm with go off for powder the 27th. It's going slow but it will be worth it. C&R plating is doing the zinc plating on bolts. Next is fitting the pingel for the ims tank. Been hot in Bakersfield 107 to 114 all week.8bbb41d30ad067fe7a2268167ed587f0.jpgbadbe602f758548a6d350b980446e09f.jpg604d1d1fb580aa3d1364d04cab3ef404.jpg7b943eff930eb7fd5d3f26bb650d017b.jpg3c2980d9bb1c1cfb238599b78e47b24b.jpg

Sent from my SM-G900V using Tapatalk



Nice build, bike looks very cool. Pipes look sick, are you going to keep them raw?

That a 4 bolt Honda sprocket hub?

Sent from my SM-G900V using Tapatalk

Posted

Sent all my hardware out.today to be zinc plated, once it's back I can build. I'm alittle behind. Question, has anyone done business with SF Racing? I contacted them for some PEP shocks. I was curious about their work.

Sent from my SM-G900V using Tapatalk

Posted
Sent all my hardware out.today to be zinc plated, once it's back I can build. I'm alittle behind. Question, has anyone done business with SF Racing? I contacted them for some PEP shocks. I was curious about their work.

Sent from my SM-G900V using Tapatalk



Most of the guys I race with run peps from Seth at sf racing. That being said, I ordered a set from him in early April and haven't received anything yet...


Sent from my iPhone using Tapatalk
  • 2 months later...
Posted

Darn heat wave makes it hard.to work in the shop, but I am back at it. Stem is in, and a-arms are on. Pick up some lsr front hubs this week..so the goal is to have the front end on minus shocks and motor in this week. Only hold up is my powder guy.0b07ea711c2ca64aae84abc7e25ae93a.jpg7aa492f5664464dd3c35f552d130b889.jpg9c0d577a89a819c477b701c27d8a010b.jpg1c824b73dbe452ccbbd7c4f0ea011c56.jpgc0527cbb9332e930196778e324801df2.jpg

Sent from my SM-G900V using Tapatalk

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...