Long travel is tight wiring is done (not tested), plastics fit, chain done, plugs and caps done
tonight flush brakes, install dyno kit from alba, clean air filter , and change oil,
waiting on rear grab bar and rear skid plate
if test ride goes well, DC conversion.
pic's up tommarow. talked to nn2 a.k.a yfzrd and his project hybrid stalled, he want more upgrades and it got on to the back burner.
he said his rode great with a +5 swing arm "great hole shots"