I want to run alky but I'm about to give up. I have 38 to 39.5 mikunis with 116 tube drilled w/ powerjets on a 10 mil cub. It had 60 pilots and needle clip was 2 nd from top. It would run but I had to give it throttle to crank. Had to kick it 20+ times. I went to a 50 pilot and moved clip to 3rd air screws set 1 1/2 turns fired right up and idled I made about four 200 foot passes and killed it. Got it up to about 165 degrees from then on it was 20+ kicks to get it running and having to give it throttle again. I'm at 200asl 75 degrees 176 psi Any help on which way to go would be appreciated.