Jump to content

Recommended Posts

Posted

A&S has 4mm right now and will be dynoing the stock and 7mm hopefully next week so if anyone is interested let him know 517 244 0712

Twink

Posted

If you guys don't want to wait 2 or 3 months for cylinders let me know. Right now there is a problem with company doing the Nikasil coating. They are taking so long to do them most of the cylinders going out are not plated. This means more costs for you since you will have to cover the high cost of having them coated. The manufacturer has a quantity discount so when a builder sends them a single cylinder of course the costs are higher. How much higher... right now most of the shops are retailing the Cubs for 1000. Right now I can get 68mm cubs already Nikasil coated for 875 for stock, 4mm, and 7mm strokers. These are in stock ready for shipping. These require big bore domes (Prodesign work fine) or reworking your stock head.

Posted

If you guys don't want to wait 2 or 3 months for cylinders let me know. Right now there is a problem with company doing the Nikasil coating.

 

Dan is having no problem getting them niikasil coating

Posted

Yeah the builders that are having them nikasil plated as they get them isn't the problem... it's when a batch comes out they are taking a while to get done before getting shipped out to distributers.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...