-Herbie- Posted March 14, 2010 Report Posted March 14, 2010 when installing the shorter studs into the cylinders should they screw down so that threads are completely imbedded? I screwed them in using two nuts and it feels like they are bottoming out yet 1-2 threads are still showing. Quote
-Herbie- Posted March 14, 2010 Author Report Posted March 14, 2010 when installing the shorter studs into the cylinders should they screw down so that threads are completely imbedded? I screwed them in using two nuts and it feels like they are bottoming out yet 1-2 threads are still showing. Can anyone help on this, wanna get this finished up. Thanks. Quote
powertripn Posted March 14, 2010 Report Posted March 14, 2010 Can anyone help on this, wanna get this finished up. Thanks. Having a couple threads still showing is normal.It's nothing to worry about. Quote
powertripn Posted March 14, 2010 Report Posted March 14, 2010 Can anyone help on this, wanna get this finished up. Thanks. Also make sure you don't overtighten the studs.You can distort the deck surface and create sealing problems. Quote
-Herbie- Posted March 14, 2010 Author Report Posted March 14, 2010 Also make sure you don't overtighten the studs.You can distort the deck surface and create sealing problems. ok cool thanks guys, i just snugged them up and went another 1/4 turn or so. Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.