I am building my first banshee. I started off whith a mild build. I.e. Dune/drag port, cpi pipes, cool head 18cc domes, 34mm pj's, k&n pods, adjustable timing plate etc. I never even got run this set up beforer I picked up a full k&t 4mil cub with lock up, 35.5 mikunis's with billet bowls, torch works radiator, k&n pods, shearer in frame pipes, lonestar +6 chrome swing arm, jj&a 40mm hillshooter axle and billet carrier. With some other little things. This is what I wanted to do with bike over time but I managed to get it all for. a smokin deal and well be going big from the start. I can't wait to get all together.