When doing a leak down test should you be able to do one side then the other or do you have to do the whole motor at once. Because my motor won't allow me to do the right then the left, but the whole motor will hold 6lbs. for 6 minutes. Is this OK, if not what problem do I have? Thanks in advance for any and all the help!!!