Working on a 1997 Banshee. It is completely stock except for the aftermarket chain roller. I want to install a stock chain roller. So I bought Yamaha chain roller 2gu-22151-10-00 (number 10 on the schematic) and the pipe/bushing 2gu-22155-00-00 (number 42 on schematic). Here is my dilemna since this had a aftermarket chain roller on it the stock pipe/bushing was removed from the swingarm or else I would just install the new pipe/bushing in the same spot as the old one, but its not there so I'm left guessing. This pipe/bushing is pressed on the swingarm so its not like I can assemble it and move it slightly this way or that after the swingarm is on the quad. I looked in a Clymer Manual and a Yamaha Manual. I didn't see any reference at all to this pipe/bushing. Does anyone know how far to press this pipe/bushing onto the swingarm ? And any tips on getting it pressed on the swingarm without damaging it ?
I can't get my pictures to load, here is a link to a schematic https://www.yamahapartshouse.com/oemparts/a/yam/50038c7df870021f60a0b570/rear-arm