89 LT250R
Totally redone from the frame up.
-frame was sandblasted ,primered and painted metallic blue
- engine was tore down put in new crank, rod,.040 weisco piston and rings, new .040 bore, mild porting, shaved head and new clutch.
- every bearing or bushing was replaced, a-arms,swingarm,axle and every bearing in rear suspension linkage was replaced.
- new upper and lower balljoint, and tierod ends
- new FMF fatty with powercore silencer
- UNI clamp on air filter
- carbon fiber reeds
- +6 custom swingarm
- new chain (hd)
- skidplate
- fat bars and clamp
-+2 durablue axle
Everything is new on this quad other than the plastic.
Looking to trade for banshee or 250 2stroke bike or $3000 obo
Im trying to get the pic to work now