Jump to content

Recommended Posts

Posted

1987 shelby-z

rebuilt this summer from bottom to top

 

crank turned

new crank bearings

bored.030 over

new pistons, rings

new head

new head bolts

new water pump

new timing belt

new oxy sensor

new 3"swing valve

new 3" downpipe

new passenger side cv axle

new passenger side wheel bearing

new ignition coil

new journal bearings in turbo

polished valve cover

new clutch

new pressure plate, and bearing

flywheel turned

 

$3000 firm

 

i might be forgeting some things

 

will also come with a new strut in box

extra set of rims

 

located in angola ny.

 

Picture111.jpg

 

Picture016.jpg

  • 2 weeks later...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...